On January 28, 2008,
the Zoning Administrator approved the application request to convert an existing duplex into a two-unit condominium
project. No waivers of Title 19 development standards are proposed with this
application. The code required two-car parking per unit will be provided.
The property is located in the R-2 District. The Zoning
Administrator’s approval is based on the following findings and subject to
the following conditions. |
1.
As conditioned, the project will substantially comply with
all applicable standard plans and specifications, adopted City and State Building
Codes, and zoning requirements for new buildings related to the district in
which the proposed project is located at the time of original construction.
2.
The project is consistent with the adopted goals and
policies of the Land Use Element and other Elements of the General Plan and the
Local Coastal Program Land Use Plan.
3.
The design of the development will not conflict with any
easements acquired by the public-at-large for access through or use of property
within the proposed development.
4.
Public improvements may be required of a developer per
Section 19.28.010 of the Municipal Code.
5.
This project has been reviewed, and it has been determined
that it is categorically exempt from the requirements of the California
Environmental Quality Act under Class 15, Minor Land Divisions.
6.
The plumbing system, as approved, will be in substantial
compliance with the City of
7.
The establishment, maintenance or operation of the use or
building applied for will not, under the circumstances of this particular case,
be detrimental to the health, safety, peace, comfort and general welfare of
persons residing or working in the neighborhood of such use or be detrimental
or injurious to property and improvements in the neighborhood or the general
welfare of the City.
CONDITIONS
1.
The project shall be in substantial conformance with the
submitted plot plan, floor plans and elevations, except as noted below.
2.
No more than two dwelling units shall be permitted on the
site.
3.
All work conducted within the public right-of-way shall be
approved under an encroachment permit issued by the Public Works Department.
4.
Each of the tenants of the proposed condominium shall be
given 180 days’ written notice of intention to convert, prior to the
termination of tenancy due to the proposed conversion.
5.
Each of the
tenants of the proposed condominium shall be given written notification within
10 days of the approval of the condominium conversion permit establishing the
proposed condominium conversion. Proof of said notification shall be provided
to the
6.
Each of the tenants of the proposed condominium shall be
given notice of an exclusive right to contract for the purchase of their
respective units upon the same terms and conditions that such units will be
initially offered to the general public or terms more favorable to the tenant.
Such right shall run for a period of not less than 90 days from the date of
issuance of the subdivision public report (Section 11018.2 of the Business and
Professions Code), unless the tenant gives prior written notice of his or her
intention not to exercise the right. Prior to final of the condominium conversion
permit, the applicant shall provide a copy of the written verification
forwarded to the tenants and said verification shall be presented to the
7.
Two-car parking, including one enclosed garage space, shall
be provided on site for each dwelling unit per requirements of the Zoning Code.
All parking spaces shall be maintained clear of obstructions for the parking of
vehicles at all times.
8.
The existing electrical service connection shall comply with
the requirements of Chapter 15 of the Newport Beach Municipal Code;
specifically, that each unit will have a minimum 100-amp service.
9.
Each dwelling unit shall be served with an individual water
service to the public water system, and shall maintain a separate water meter
and water meter connection. This work shall be completed prior to final of the
condominium conversion permit.
10.
The applicant shall separate the building sewers within the
building from each unit.
.
11.
The sewer service shall be separated so that each unit is
served with a sewer lateral connection to the public sewer system with a
clean-out to grade at the property line. If there is evidence that sewage is
leaking from the facility or if it is substandard, the existing sewer lateral
shall be replaced. Said work shall be completed under an encroachment permit
issued by the Public Works Department, unless otherwise approved by the
Utilities Department and the Building Department. This work shall be completed
prior to final of the condominium conversion permit.
12.
All improvements shall be constructed as required by City
Ordinance and the Public Works Department.
13.
Smoke detectors shall be provided in each bedroom.
14.
The corrections listed by the Building Department in the
special inspection report shall be made prior to final of the condominium
conversion permit.
15.
The exterior wall surfacing shall be made weather-tight as
required by the Uniform Housing Code.
16.
The property owner shall provide information to the Building
Department that the roof is a Class C fire retardant roof as certified by a
roofing contractor.
17.
The building permit obtained from the Building Department in
order to convert the subject residential units into condominiums shall be
finaled after the Parcel Map for condominium purposes has been recorded with
the
18.
A park dedication fee for two (2) dwelling units shall be
paid in accordance with Chapter 19.52 of the Municipal Code. This fee shall be
paid upon submittal of the map to the Public Works Department for plan check
and deposited into the appropriate account for Service Area as identified in
the Recreation and Open Space Element of the General Plan.
19.
This approval shall expire unless exercised within 24 months
from the date of approval, as specified in Section 20.93.050 of the Newport
Beach Municipal Code.
Appeal Period
The decision
of the Zoning Administrator may be appealed to or by the
By:
Zoning Administrator Javier S. Garcia,
AICP
JSG:ks/rm
Attachments:
Vicinity Map
Appeared
in Opposition: None
Appeared in Support:
None
|
Condominium Conversion No. CC2007-005
PA2007-252
402 Dahlia Avenue